Discuss Forum

1. The electronic conveyor-belt system, which Susan Park (A) adapted from a production-line method (B) pioneered by Thomas Langley, reduced the (C) required time being needed of assembling a SmartGadget device (D) from over ten hours to just 120 minutes.

  • A. A
  • B. A
  • C. A
  • D. A

Answer: Option D

Explanation:


Post your comments here:

Name:
Mobile:
Email:(Optional)

» Your comments will be displayed only after manual approval.