If 6 men and 8 boys can do a piece of work in 10 days and 26 men and 48 boys can do the same in 2 days , the time taken by 15 men and 20 boys to do the same type of work will be

  • A. 4 days
  • B. 4 days
  • C. 4 days
  • D. 4 days

Answer: Option A

Explanation: